Skip to content
All analytical layers
GRD
GPZ · OSD/PSE · grid-intel

Grid capacity often decides if energy land pays.

Propibay scores proximity to substations and available capacity so interconnection risk shows up before the land premium.

72illustrative energy-land score — sample parcel had no GPZ in range
Book a demo
Who it's for

Interconnect is the real optionality

Investors, developers and agents price wires, not just hectares.

Underwrite the wire before the acreage.

Distance and MW available frame the IC.

“2.3 km / 18 MW changed the bid.”
Try it

Vague 'near grid' vs. score + GPZ

Flip lenses on the illustrative grid pack.

Composite energy-land score 0–100.

What changes

Outcomes you can take into the room

  1. 01

    Price interconnection risk explicitly

  2. 02

    Treat empty GPZ coverage as a kill signal

  3. 03

    Quote distance and MW together

What it does

  • Scores energy-land suitability
  • Resolves nearest GPZ context
  • Surfaces capacity warnings

Built on

  • OSD/PSE bulletins
  • GPZ locations
  • Parcel centroid
Built forAnyone buying land for electrons, not just earth.
Why teams trust itEmpty samples stay labeled; UI still teaches the response shape.